Project name: Glass Haus Apartments

Safe access and public protection with Kwikstage scaffolding in Preston

Located in the heart of Preston, Glass Haus Apartments is a contemporary boutique development designed to deliver elevated urban living, with a strong focus on natural light, sustainability and connectivity. Built by Valeo and designed by Point Architects, the development was completed in 2026.

WMA Scaffolding delivered and installed a full Kwikstage scaffold system to support safe and efficient access around the building throughout construction. Working with the project team, our scaffold setup was tailored to the site’s access requirements, providing a practical working platform for trades through the construction and finishing stages.

The scope also included a public protection gantry, powerline protection and full hoarding to address the surrounding site conditions. With public access and nearby electrical infrastructure to consider, these protective measures were an important part of the overall scaffolding solution, helping separate construction activities from public spaces while supporting work on the building.

Location Preston, VIC

Builder Valeo

Architect Point Architects

Completion Date 2026

Services Kwikstage scaffolding

Elevating Access. Ensuring Excellence. 

Follow us on Instagram

Yarraville, with a view.
YarraGreen brings architecturally designed apartments and townhouses together around a central garden, and our full-perimeter Kwikstage and aluminium scaffold has every elevation covered.

Elevating access. Ensuring excellence.

@balmain_and_co
@sixdegreesarchitects

#Yarraville #KwikstageScaffolding #WMAScaffolding #ResidentialDevelopment
Busy main road. Live powerlines. Public footpath.

At Glass Haus in Preston, our full Kwikstage scaffold, public protection gantry, hoarding and powerline protection kept pedestrians on Plenty Road safe while the build climbed.

The build goes up. The public stays protected.

#PublicProtection #KwikstageScaffolding #WMAScaffolding #Preston #MelbourneConstruction
Big news for Geelong.

Perimeter Scaffolding has merged with WMA Scaffolding. 
Since 2001, Perimeter has supported builders across Geelong, the Surf Coast and Central Victoria, and that experience now carries straight over to WMA.

Worked with Perimeter before? Our Geelong team is ready for your next project. More on our website, link in bio.

#WMAScaffolding #PerimeterScaffolding #Geelong #GeelongBuilders #ScaffoldHire
Preserving history while keeping site and street fully protected. Heavy-duty overhead gantries, full perimeter access, and roof edge safety engineered to wrap around classic heritage brickwork. When working alongside active footpaths, WMA ensures every trade works safe and the public walks easy.

#HeritageRestoration #PublicProtection #EdgeProtection #WMAScaffolding #MelbourneBuilders
Tight boundary, zero room for error. Squeezing full-height scaffolding into narrow boundary lines while completely protecting adjacent properties takes precision design and planning. Tight spaces are where WMA shines.

#TightAccess #BoundaryBuild #WMAScaffolding #ScaffoldErectors
Perimeter protection locked in before the roof goes on. Multi-level decked platforms and full edge guardrails give frame and truss crews complete freedom to move fast and work safely at height. Built clean, solid, and ready for work, keeping your trades safe and your build schedule right on track.

#Framing #WorkingAtHeights #EdgeProtection #WMAScaffolding #ResidentialBuild